Hot-melt rubber repair agent technology

Release time:

2020-09-23

1. Preheating glue gun
Turn on the heating switch 20 minutes in advance to warm up to the set temperature
2. Grinding
Use tungsten steel grinding disc to roughen the broken rubber surface of the conveyor belt, and pay attention to prevent polishing or scorching during grinding.
3. Cleaning and activation
Mix thoroughly according to LPT920 treatment agent A and B, and apply LPT920 treatment agent evenly on the treated rubber surface. Temperature 25 ℃, humidity 60%, air for 10 minutes, when the temperature is low, should extend the drying time or hot air gun dry. (Treatment agent is now prepared and used)
4. Apply primer
On the surface of the dried LPT920 treatment agent, apply the LPT920 primer thinly and evenly, with a temperature of 25 ℃ and a humidity of 60% for 10 minutes. When the temperature is low, the drying time should be extended or dried with a hot air gun.
5. Scraping glue
When the glue gun reaches the set temperature, pour LPT920 hot-melt rubber repairing agent into the barrel of the glue gun, squeeze out the glue solution to the place to be repaired, and scrape it with a scraper. When the glue is naturally cooled to normal temperature, it can be operated.
Common problems of hot-melt rubber repair agent
1. The hot melt glue gun must be preheated 30 minutes in advance.
2, to control the temperature of the gun. If the temperature is not enough, the extruded repair agent does not melt well and is not easy to scrape. The repair agent produced by the agent with too high temperature is easy to scrape, but it will affect the tensile strength of the glue.
If the repair time is limited, let the repair agent cool naturally for 20 minutes, and then take physical cooling.
4. After repairing, the edge part should be repaired and smooth, and there should be no obvious ridges.
5. After repair, observe whether there are pores caused by permeability. If there are pores, fill them up.

Previous Page

Next Page

Previous Page

Next Page

Related News

Report to User

In order to standardize management, unify identification, ensure product quality, crack down on fake and shoddy products, and follow the principles of high quality, beauty and practicality, the company revised and upgraded the internal and external packaging of the company's products on January 1, 2022. Please understand the inconvenience caused by this!

2022-03-02

New weather in the Year of the Tiger, struggling to compose a new chapter

Chairman Tong Weibing has all his colleagues to pay you a New Year greeting with Huang! Starlight does not ask the paddlers, time does not live up to the people who care, thanks to have you 2021, we unite our hearts and ride the wind and waves! 2022 we make great efforts to move forward!

2022-01-31

Jia Li, secretary of the Zhijiang Municipal Party Committee, and his party's leaders visited Huang Shie for scientific and technological investigation and research.

On the afternoon of May 7, 2021, Jia Li, secretary of Zhijiang Municipal Committee, and his party's leaders visited Huang Shide for scientific and technological investigation. Chairman Tong Weibing gave a warm reception and accompanied him to visit the company. Tong Weibing introduced the company's development process, the company's current situation and future development plans to Secretary Jia.

2021-05-12